Degei.com

ReptileSoftware.com

TheSnakeSoftware.com

HerpSoftware.com

 

Purchase

Now.

 

FREE Version

View the Online Docs and Screens shots.

Visit the Degei Forum.

Support DHD by putting a banner on your site.

 

 

 

floG Hooks

 

24 inch cube cage construction.  1/2 inch plywood.

Add litter dam, header, and door stops.  Apply paint treatment.

Line interior walls with tile board.  Seal seams.

Seams all done with white silicone.  Line floor with plexi and seal.

Wiring for lighting and heat.

Ceiling view of light and flex.

Flex installed and tested.  Cover with plexi.  Put in only a couple of screws and let plexi heat up before adding the rest of the screws.

Seal with silicone after heat up. 

Dimmer installed, perches installed.

Gauge installed, tidy up wiring.

Completed ceiling view.

Completed exterior view with doors installed.

Done.  Holds 10 degree vertical gradient across the cage diagonally from top right to bottom left.

 

 

Degei project code line count:

180,516

Register your version of Degei.

 

Fauna Top Sites         

©2004-2007 Damon Theis  |  Hosting by EyeHit.com, a division of Degei, Inc.