24 inch cube cage construction. 1/2 inch plywood.
Add litter dam, header, and door stops. Apply paint treatment.
Line interior walls with tile board. Seal seams.
Seams all done with white silicone. Line floor with plexi and seal.
Wiring for lighting and heat.
Ceiling view of light and flex.
Flex installed and tested. Cover with plexi. Put in only a couple of screws and let plexi heat up before adding the rest of the screws.
Seal with silicone after heat up.
Dimmer installed, perches installed.
Gauge installed, tidy up wiring. Completed ceiling view.
Completed exterior view with doors installed.
Done. Holds 10 degree vertical gradient across the cage diagonally from top right to bottom left.
|
| |||||||||||||||||||
| ||||